Smart CI Group was appointed to deliver the construction of a new general-purpose agricultural building for Victoria Farm in Hadlow, Kent. The project required a full bespoke solution, from groundworks and foundations through to the design, fabrication and installation of a steel portal frame building.
Designed to support modern agricultural operations, the new facility needed to be durable, practical and adaptable, while also providing efficient access and long-term reliability.
The client required a robust, multi-functional building capable of supporting a range of agricultural uses.
Key considerations included:
The project also required careful coordination across multiple phases, ensuring all elements from the groundwork to steel erection aligned seamlessly.
At Smart CI Group, we approached this project with a fully integrated delivery model, managing every stage from initial site preparation through to the final construction.
We began with comprehensive site preparation works, including:
This created a solid and reliable base for the structure and future site use.
A series of reinforced concrete foundation bases were installed to support the steel portal frame. These were carefully set out and constructed to ensure structural integrity and alignment with the building design.
In addition, we delivered:
Effective drainage was a key component of the project. Our team installed a stormwater drainage system, including pipework and a soakaway solution, to manage surface water and protect the building and surrounding areas from water-related issues.
The main structure comprised a steel portal frame building measuring approximately 24m x 12m, 6m to eaves height.
The building was designed and erected with strength and efficient in mind, featuring:
The building was also designed to be solar PV ready, supporting future sustainability initiatives.
To complete the facility, we installed:
The completed building provides Victoria Farm with a high-quality, versatile agricultural facility designed to meet both current and future operational needs.
Key outcomes include:
This project demonstrates Smart CI Group's ability to deliver end-to-end construction solutions, combining groundworks, civil engineering, and structural steel expertise within a single, coordinated delivery.
By managing every stage of the project, we ensured consistent quality control, an efficient project coordination and a smooth transition between each phase of works.
For more information please feel free to contact us and one of our advisors will be available to help.
Office Opening Hours: 9:00AM – 17:00PM Monday – Friday
Please leave us an email if out of hours.
How can we help?