Stainless Steel Fabrication

The Smart CI group were appointed to complete the full positioning of 1No new 10,000l chemical tank to an existing production area. Once positioned a full measure, design and fabrication of access stairs and gantry walkway was undertaken by the Smart engineering team. Our fabrication operatives completed all associated bespoke stainless steel pipework along with isolation valves.

As part of the enabling work for the above project our F- GAS trained HVAC engineers completed the temporary removal and reinstatement of overhead air conditioning cassette unit due to height restriction when positioning the tank.