Project Overview

Over the course of more than a year, Smart CI Group was entrusted with the delivery of the TG7 development at Thanet Earth, one of the UK's largest and most technologically advanced glasshouse growing facilities.

Acting as principal contractor, our role extended far beyond a single construction package. Including infrastructure and drainage works through to structural steel, HVAC, electrical installations, internal fit-out and external civil, the development brought together expertise from across every division of Smart CI Group.

The project became a true showcase of our ability to manage and deliver complex, multi-disciplinary programmes within live operational environments, providing the client with a single point of responsibility from the earliest stages of construction through to final handover. 

Building the foundations

The project began with significant enabling, groundwork and civil engineering works to prepare the site for the development. 

Working within an active growing facility required careful planning from day one. Formation levels were established, drainage infrastructure installed, foundations constructed and the site prepared to support both the new welfare facility and the wider operational infrastructure surrounding it. 

While much of this work would ultimately disappear below ground, it formed the backbone of the entire project and laid the foundations for every stage that followed.

A substantial drainage package was delivered across the development, including foul and surface water systems, carrier drains, chambers, pump stations and associated infrastructure. These works were carefully integrated into the wider site layout to support the long-term operation of the facility while ensuring minimal disruption to ongoing activities.

Thanet Earth welfare facility